EXECUTION DESCRIPTION
It consists of waterproofing of flat and semi-inclined reinforced concrete slabs, during the new execution of AVE railway station for transit of high Speed train.
It was waterproofed approximately 10000m2 by DESMOPOL system, a mono-component polyurethane membrane, not needs a hot spray application, was applied over flat concrete slabs covering the station space, and later was finished as a green roof.