GENERAL SPECIFICATIONS
- two component, UV resistant, high elongable, fast curing pure polyurea for filling control, construction/control joints and for reparation of fissures and cracks on hard wheeled vehicular traffic
- cold process using dual-component polyurea pump for joints or plural component dosing unit, or application by pouring gun or dispensing handle having a static mixer.
- do not use on structural joints
- 100 % solid content, free from harmful VOC compounds, therefore, does not hurt the ozone layer (VOC's zero). It doesn´t emit substance to the environment once installed.
PACKAGING
Metallic drum kit, in two different formats:
- LARGE KIT: 20 kg each component (B side: amines and A side: isocyanates).
- SMALL KIT: 60 kg each component (B side: amines and A side: isocyanates).
STORAGE AND SHELF LIFE
12-months shelf life is stored in original containers in a dry environment at a temperature between 5-35 ºC (41-95°F). Keep away from direct sunlight, extreme heat, cold or moisture. Once the tin has been opened, the product must be used. Once opening blue drum (B-side)it must be agitated mechanically before inserting the transfer pumps and use.
APPLICATION METHOD
Clean up the surface of the joint or crack, removing any dust, dirt, flaking materials, grease, or efflorescence. Remove any silicone-based products existing on the substrate. In case of doubt of all above, apply before in a restricted area and to check the adhesion strength
HEALTH AND SAFETY
Respiratory Protection: When handling or spraying use an air-purifying respirator. Skin protection: Use rubber gloves, remove immediately after contamination. Wear clean body-covering. Wash thoroughly with soap and water after work and before eating, drinking, or smoking. Eye / Face: Wear safety goggles to prevent splashing and exposure to particles in the air. Waste: Waste generation should be avoided or minimized. Incinerate under controlled conditions in accordance with local laws and national regulations. Re-occupancy of the work site without respiratory equipment is minimum 24 hours providing the correct ventilation for the area sprayed. Contractors and applicators must comply with all applicable and appropriate guidelines for storage and safety guidelines.These safety recommendations for handling, are necessary for the implementation process as well as in the pre and post, on exposure to the loading machinery. Dispose waste in accordance with star or/and local regulations.
TECHNICAL DATA OF THE COMPONENTS
PROPERTIES
|
COMPONENT A
|
COMPONENT B*
|
Specific gravity ISO 1675
|
1,11 ±0,05 g/cm³
|
1,10 ± 0,05 g/cm³
|
Viscosity (at 12 rpm) ISO 2555
|
850±50 cps
|
1.100 ± 250 cps
|
Mix ratio – in weight
|
100
|
102
|
Mix ratio – in volume
|
100
|
100
|
* Data for component B pigmented in gray. For other colorations or neutral, consult the official COA issued by Tecnopol (Certificate of Analysis for each batch delivered). Results performed in the laboratory at 23ºC (73ºF)and 50% RH, under controllable conditions.
TECHNICAL DATA
PROPERTIES
|
RESULTS
|
Specific gravity ISO 1675
|
±1.05 g/cm³
|
Elongation at break ISO 527-3
|
>400%
|
Tensile Strength ISO 527-3
|
>10 MPa
|
Hardness Shore A/D DIN 53.505
|
75/40
|
Tack-free time
|
±5 min.
|
Total dry time
|
±2 hours
|
Total cured time |
7 days |
Application range temperature |
25-35 ºC (73-77ºF) |
VOC content
|
0
|
Results were performed in the laboratory at 23ºC (73ªF) and 50% RH, under controllable conditions. These values may vary depending on the application, climatology, or substrate conditions.