Primer EP

PRIMER EP-1020

Two-component epoxy resin as a primer

Two-component, 100% solids content epoxy resin. It is specially designed to increase adhesion to substrates and improve planimetry for liquid waterproofing systems TECNOCOAT and DESMOPOL and flooring systems TECNOTOP and TECNOFLOOR.



Uses

For application in the following situations:

  • increase adhesion on on concrete, mortar, or ceramic tiles substrates
  • to be used as  a resin mortar for concrete substrate or joints of ceramic tiles (adding Silica Sand, or calcium carbonate)

NOTE: call our technical department about the application to other substrates or situations

density 1.05± 0.1 g/cm³
viscosity  600± 250 cps
pot-life  ±30 minutes
dry time ±2~3 hours
application method by brush, by a short nap acrylic wool or notched trowell


TDS. Technical Data sheet(PDF)
MSDS, CERTIFICATES, APPROVALS...(link)
CE Marking - Declaration of Performance (DoP)

Declaración de prestaciones

PRODUCTSTANDARDDATEREVISIONLINK
PRIMER EP-1020 1504 2023-08-07 0 DOWNLOAD

GENERAL SPECIFICATIONS

  • Two-component, 100% solids content epoxy resin, solvent-free, odorless, which once dry forms a continuous film in concrete, mortar or ceramic substrates increasing adherence for liquid waterproofing and flooring systems
  • Its consumption depends on the situation of the substrate, irregularities that it presents or level of planimetry. It can be applied in a thick layer, self-leveling system
  • Do not use with groundwater pressure (water pressure coming from the back of the treated element.
  • Can be used as an epoxy-mortar, adding Silica Sand or calcium carbonate (mixing ratio in weight 1:4), to fill irregularities.
  • No dilution needed at all
  • It holds a CE marking on the basis of a statement made DoP Declaration of Performance (DoP) under the EN-1504-2:2004 table 5

PACKAGING

Metallic kit pails: 10,3 kg.+4.7 kg.

SHELF LIFE

12 months at temperatures between 5 and 35° C (41 to 95 ºF), provided it is stored in a dry place. Once the tin has been opened, the product must be used.

APPLICATION METHOD

The following factors prior to application should be checked:

  • previous preparations of the substrate through physical processes (substrate preparation (sanding, polishing, shot blasting, or milling) for laitance and reliease agents as well as for the opening of the surface pore, achieving a suitable anchorage profile. (CSP 3 -4-5, according to the ICRI)
  • existing holes or areas with a lack of material must be repaired using some or our epoxy resins: Primer EP-1020/Primer EP-1010
  • joint fillings with Mastic PU
  • in existing dilatations joints: remove old material, clean, and fill with Mastic PU. Use also Tecnoband 100 to cover, if necessary.
  • joint filling for installation, work and consolidation of substrates.
  • general cleaning of the substrate, removing existing dust, dirt, grease or efflorescence. The substrates must be resistant and cohesive.

Mortar, concrete or ceramic substrate

  • substrate must be fully cured (the concrete curing process is 28 days). Check the maximum degree of moisture permittivity of the substrate
  • mix the two components using a mechanical shaker for approximately 4-5 minutes (medium speed)
  • apply the resin in two or more thin crossed coats until the desired planimetry is achieved. (always wait for drying before recoat). Consumption around 150 and 250 g/sqm depending on the roughness of the substrate. Apply as many coats as the substrate needs. Always respect the recoat time between coats or between different materials. In case of rain, apply a thin layer, consumption approx. 100-150g/sqm.
  • also can be applied in a single coat, mixed with Silica Sand (mixing ratio in weight 1:4), spreading  using a notched trowel or rubber lip in a single thick coat. Consumption around 200 and 400 g/sqm.

NOTE: For other types of substrates, weather conditions or final use, consult our technical department.

HANDLING AND SAFETY

These safety recommendations for handling, are necessary for the implementation process as well as in the pre and post, on exposure to the loading machinery.

  • Respiratory Protection: When handling or spraying use an air-purifying respirator.
  • Skin protection: Use rubber gloves, remove immediately after contamination. Wear clean body-covering. Wash thoroughly with soap and water after work and before eating, drinking, or smoking.
  • Eye / Face: Wear safety goggles to prevent splashing and exposure to particles in the air.
  • Waste: Waste generation should be avoided or minimized. Incinerate under controlled conditions in accordance with local laws and national regulations.

Consult the material and safety data sheet of the product (MSDS) or contact our technical department.


TECHNICAL AND CHEMICAL PROPERTIES

PROPERTIES

VALUE

Density       ISO 1675

1.05± 0.1 g/cm³

Viscosity       ISO 2555

600 ±250 cps

Density components A/B         ISO 1675 1.25± 0.05 g/cm³ /1.10± 0.05 g/cm³
Viscosity components A/B        ISO 2555 700± 100 cps/ 450 ±50 cps
Mixing ratio (in weight) 2.20:1
Solids content      ISO 1768 100%
VOC components A/B     (volatile organic compounds) 0 g/l +0 g/l
Shore Hardness A      DIN 53.505 >75

Adhesion to the concrete

>1.5 MPa

Determination of adhesion by direct pull-off      UNE-EN 1542   (yield 300 g/sqm) 3.4 MPa
Vapor water permeability          UNE-EN ISO 7783   (yield 300 g/sqm) Sd=53.5 (Class III) /  0.4 g/sqm/day / µ=445,938
Liquid water permeability         UNE-EN 1062-3   (yield 300 g/sqm) W=0.0001 kg/(sqm * h0,5 ) (PASS, <0,1)
Reaction to fire       EN-13501-1:2007+A1:2010 Efl

Times:  pot-life / dry / recoat

±30 minutes / 2~3 hours / 3~48 hours

Application temperature range (substrate and environment) 5~35ºC /  5~30ºC   (41~95ºF / 41~86ºF)
Use temperature range (environment) -20~80 ºC   (-4 ~176ºF)

Max. moisture on the substrate

±4 %

Max. environmental moisture

±80%

Results performed in the laboratory at 23ºC (73ºF) and 50% RH, under controllable conditions. These values may vary depending on the application, climatology, or substrate conditions.