GENERAL SPECIFICATIONS
- Allows the reduction of mixing and final drying times of epoxy resins
- It facilitates the entry into use of these epoxy resins, especially in cold climate environments.
- Make a mixture of approximately 0.5% (by weight) of the total epoxy resin to be added.
- Add to component A, mix until homogenized; add component B
- The mixing and final drying times are reduced according to the following table:
PRODUCT
|
POT-LIFE
|
DRY TIME
|
Primer EP-1010
|
±30 min.
|
±2.5 hours |
Primer EP-1020 |
±15 min. |
±2.5 hours |
Primer EP-1040 |
±25 min. |
±2 hours |
Tecnofloor T-3020 |
±35 min. |
±2 hours |
Results performed in the laboratory at 25ºC and 50% RH, under controllable conditions. These values may vary depending on the application, climatological or substrate conditions.
PACKAGING
Metal tins: 6 kg
SHELF LIFE
12 months at temperatures between 5° C and 35° C (41 ºF to 95 ºF), provided it is stored in a dry place. Once the tin has been opened, the product must be used.
HEALTH AND SAFETY
These safety recommendations for handling, are necessary for the implementation process as well as in the pre and post, on exposure to the loading machinery.
- Respiratory Protection: When handling or spraying use an air-purifying respirator.
- Skin protection: Use rubber gloves, remove immediately after contamination. Wear clean body-covering. Wash thoroughly with soap and water after work and before eating, drinking, or smoking.
- Eye / Face: Wear safety goggles to prevent splashing and exposure to particles in the air.
- Waste: Waste generation should be avoided or minimized.
- Incinerate under controlled conditions in accordance with local laws and national regulations.
- Re-occupancy of the work site without respiratory equipment is minimum 24 hours providing the correct ventilation for the area sprayed.
- Contractors and applicators must comply with all applicable and appropriate guidelines for storage and safety guidelines.
Consult the material and safety data sheet of the products of the system.